[Plumber]
Shower installation Totowa
- Licensed plumbing + HVAC
- Insured
- Open 24/7
- On site within the hour
- Google rated
Why customers need shower installation
Full bath remodel, or swapping the old tub for a walk-in shower so somebody does not have to step over a wall every morning. Both start the same way: what happens behind the tile decides how long it lasts. We see plenty of Totowa bathrooms where a previous shower was set without proper pitch, and the ceiling below tells the story a few years later.
What shower installation in Totowa includes
We set the mixing valve at the correct depth for your finished wall thickness so the trim sits flush later. The drain gets tied in, the pan pitched to the drain on all sides, and the base set solid with no flex. Supply lines are run and secured, the valve gets a pressure balance or thermostatic control depending on your choice, and everything is water tested before a single tile goes up.
How long shower installation takes
The plumbing side of a tub-to-shower conversion is usually one to two days: demolition and rough plumbing first, then trim and final connections once the walls and tile are done. A straight base and valve replacement in an existing opening is a single day. Tile and finish work set the overall timeline for the room.
What to expect when we do the work
Fixed price in writing before demolition, floors and the path to the bathroom protected, and debris hauled out instead of piled in the driveway. We water test the pan and valve with you present so you see it dry before anything gets closed up. Done right, none of this work is ever seen again, which is exactly the point.
This job sits under our plumber totowa work. If you would rather write it out than call, use the contact page.